Details of completed projects |
|
vReconstruction
of the headquarter building of the former Alrasheed & Anfal
companies
.
Cost of the project: - 6190830000 DINARD
Project Duration: - 850 days.
Project Description
The
total area of the story is = (10000) 2
it
Includes a eleven-storey building, in addition to the ground floor
and basement, it is divided into two parts, the lower part,
four-storey building with ground floor and the upper part of the
other (the tower) contains the eight floors.
|
|
-
Reconstruction of building of the Ministry of Foreign Affairs.
Cost of the project: - 9300000000 DINARD
Duration of the project: - (595) days .
Project Description :
The Main building of 10 floors consisting of a total net area
(16000) m 2, with ground floor and basement, the Foreign Service
Institution , in addition to the Protocol & ordinances building and
interim office building. |
-Reconstruction
and the Ministry of Finance
Cost of the project: - 3000000000 DINARD
Duration of the project: - (365) days.
Project Description
The
Building is consisting of two wings :the right & the left (12)
floors , the area of the College (17950) m 2 with external areas ,
roads, pavements and corridors . |
-Reconstruction of the National Council Building
Cost of the project: - 12,942,249,562 dinars (representing the first
level, second level, third level and first part of the fourth level)
Project Description
:
The first level: - the reconstruction of servicing buildings,
including, the site, and the ancient holl of Hammurabi building .
the second level: - reconstruction of the building and the
special wing of the and machinery building.The third level:
Part I: - the Internet building and guard towers,the front
& the back guard building of the new garages, the two ;front & back
reception buildings and the rain water system.
Part II: - of the civilian, health and electric work only
(the rehabilitation of the site and the fountain, treatment of the
basement of machinery buildings, main entrance building, car
garages, a heavy water purification system, water drinking system
and the health work, especially rain water net and the car park, the
work of sound system and furnishing of Hammurabi Hall.
Part III:
- contains all the complementary work of executing the previous
stages.
The fourth level
/
the second part of the cost (3966889000) DINARD . |
-
Reconstruction of Labor & Social Affairs Building
Cost of the project: - 1800000000 DINARD
Date direct: - 29/6/2003
Completion date: - 1/12/2003
Duration of the project: - (150) days.
Project Description :-
Main building of the headquarters of the Ministry consisting of the
four-stories ,area: (6000) m 2, and basement area (1500) m 2,the
divan and services and reception building . |
|
-
College
of Engineering Information / University of Nahrain
Cost: 3.901.139.000 dinars
The recipient: the Ministry of Higher Education & scientific
research .
Date Direct 1/6/2005
Completion date 1/3/2008 |
|
-
-
College of
information Engineering complex project / University of Alnahrain :-
-
Cost: 3990000000 dinars (three billion, nine hundred and ninety
million dinars)
- Project duration: 30 months
- The proportion of achievement: the work performed in full and 100%
delivered by employer
- Project
description:
The
project consists of three parts, namely:
A - Dean and the building consists of 3 one-story floor area of 1100
m2
B - building the scientific divisions and consists of floor area per
story in 1510 m2
C - the laboratory building and consists of 3 floors and an area of
550 m2 per floor. |
|
-
-Central Library
Project / University of Alnahrain :-
- Cost: 430 million dinars
- Project Duration: 5 months
- The proportion of achievement: the work is full performed 100%,
and the recipient ..the project is initial delivered .
- Project
description:
-
The
building consists of a large hall with a floor ,& rooms for
administration & other for the storage of books it is consisting of
one floor + half floor, a total of completed area is 560 m2, the
constructional structure of company is formed by Al-Faruq company
"and only the finishing work is turned to our company. |
|
-
-
-
site work project of
Central Library / University
of Alnahrain
-
Cost:
46 million dinars
- Project duration: 15 days
- Execution rate: 100% (done) the project is in the first delivery
now.
Description of
work:
the
company has been mandated to implement the business recently, as
additional work for the company including the implementation of
reinforced concrete corridors of 500 m 2 amount, with the floors ,
curbstone and wavy colored pavement . |
|
-
shopping
center project building /university of Alnahrain.
-
Cost: 140 million dinars
- The duration of the work: 80 days.
- Execution rate: 100% completed in the firstlevel of delivery.
- Project
description:-
it
consists of a single building consisting of one-story showroom;
including rooms for goods , management and rooms for the storage of
cooled materials . |
|
-
-Casino
the Shat Al-Arab in Basra
Cost of the project: - 322,344,000 dinars
Project Duration: - 80 day
Project Description
Flat iron hold towards the Shat al-Arab consisting of iron & Runnel
with its accessories and with the position of seating, it is
representing as fallow:
Interior hall is divided into two parts, separated by a firm
of wood partition, up 1.8 m
A - Department of Families (the south side of the hall)
B – General department is located on the north side of the hall.
Areas sitting room in the ground floor with an out service.
|
Reconstruction of roads and bridges building / former Aljihad
Cost of the project: - 849,000,000 dinars
Project Duration: - 545 days.
Project Description
A three-stories building the size of the College (1970) m 2, with a
large hall of meetings, including floors, middle lighting room. In
addition to the site work and the guard rooms and the fence. |
|
-
-
Free Zone- in Alqaeem .
Cost of the project: - 708000000 dinars
Project Duration: - 165 days.
-The
rehabilitation of administrative building and sheds and health
accessories, and offices.
-The establishment of roads and areas with the tiling and curbstone
with all of the site and the outer fence.
- The establishment of two buildings in the Ministry of Labor and
Social Affairs
Cost of the project: - 515,696,000 dinars
Duration of the project: - (307) days.
|
|
-the
establishment tax-management of Alnajaj Governorate
Cost: 621467000 dinars
The beneficiary: the Ministry of Finance
The duration of the work 247 days.
. |
|
presidency building
university
of wasit
project cost 2052919000
the beneficiary side : ministry of high education
&scientific research.
The
Reconstruction Rafidain Bank /Alkefah Branch:
Cost: 600000000 dinars
The recipient: the Ministry of Finance. |